States and risks
Mark which steps belong to the current, transition or future state, record rated risks, and filter or colour the diagram by them.
What states and risks are
States let you show more than one version of a process on one board, for example how it works today (Current), during a change (Transition) and after it (Future). You associate each step with the states it belongs to, then filter or colour the diagram by state.
Risks let you record what could go wrong and how serious it is. Each risk has a likelihood and a consequence, which give it a rating. You associate risks with the steps they affect, then colour the diagram by risk rating to see where the exposure is.
Applications (the IT systems steps use, such as SAP) are a third kind of block that works the same way; see Applications. Constraints and limitations (what the solution must or can't do, with a status) are another; see Constraints and limitations.
States and risks are blocks on the board. By default they sit in a row above the diagram. They aren't part of the process flow, so they don't change the automatic layout, and associating steps with them doesn't pull steps around.
Add a state
- Click the flag icon in the toolbar, or right-click the empty canvas and choose Add state here.
- New states are named Current, Transition and Future in turn, then "State 4", "State 5" and so on. Each new state gets its own light colour, whoever adds it (you, the AI or an MCP agent), so Current and Future (or Proposed) are never the same colour.
- Rename a state by double-clicking it or in the inspector. Add a description in the inspector if you like.
- A state's colour is its fill. Change it with Colour in the inspector, or right-click, Style, Fill colour.
- Select a state block to see how many elements are in it, with Select them to select them all.
- Put everything in a state at once: select the state block and choose Add all N elements in the inspector. Every step, event, gateway and data object on the board is associated with it (annotations aren't). Remove all takes every element out of the state. The same buttons are on risk and application blocks.
Add a risk
- Click the warning icon in the toolbar, or right-click the empty canvas and choose Add risk here. Type its title straight away.
- In the inspector, give the risk a description, a Likelihood and a Consequence. New risks start at 3 × 3 (Possible, Moderate) until someone rates them.
| Level | Likelihood | Consequence |
|---|---|---|
| 1 | Rare | Insignificant |
| 2 | Unlikely | Minor |
| 3 | Possible | Moderate |
| 4 | Likely | Major |
| 5 | Almost certain | Severe |
The risk rating is likelihood × consequence, from 1 to 25, banded as on a standard 5 × 5 risk matrix:
| Band | Rating |
|---|---|
| Low | 1 to 4 |
| Medium | 5 to 9 |
| High | 10 to 16 |
| Extreme | 17 to 25 |
The rating and its band show on the risk block and in the inspector. A risk with no likelihood or consequence set shows "Not rated".
Associate elements with a state or risk
Any step, event, gateway, data object or annotation can be associated with any number of states and risks. There are four ways:
- Drag the element onto the state or risk block. The block shows "Drop to associate". When you let go, the element is associated and snaps back to where it was.
- Draw a line between the element and the block, as you would connect two steps.
- Tick it in the inspector: select the element and tick the state or risk under States or Risks.
- Right-click: choose States or Risks and tick the one you want. With several elements selected, this associates (or, if they are all already in it, removes) all of them at once.
- All of them: select the block and choose Add all N elements in the inspector.
An association is shown as a dotted line labelled "associated". Lines to a risk are amber, like the risk block, so they stand out from lines to states and applications. A block above its element joins it straight up; a block you move beside or below it joins by the nearest sides (for example straight across when it sits next to the step), whichever way round the association was made. To remove one, untick it in the inspector or right-click menu, or delete the dotted line.
Hide a state, risk or association
You can hide a state or risk once it has been added, without deleting it. This works the same way on process diagrams and mind maps.
- Hide a state or risk: select its block and choose Hide on the diagram in the inspector (on a mind map, Hide on the map), or right-click the block and choose Hide on the diagram. With several blocks selected, the right-click menu hides them all.
- Hiding a state or risk also hides its associations: the dotted lines, their "associated" labels, and the chips on the elements it's associated with. Colour by state or risk rating ignores it too.
- Hide just one association: select the dotted line and choose Hide on the diagram in the inspector, or right-click it. The element's chip for that state or risk goes as well. The element is still in the state, risk or application, so Colour by still colours it and the filter still includes it; hide the block itself to leave it out of the colours.
- Hiding changes the board for everyone. Nothing is lost: the associations are kept, the element's details still list the state or risk under States or Risks (marked "(hidden)"), and the board's exports still include it.
- See hidden things: when anything is hidden, the states and risks bar shows N hidden. Click it to show hidden states, risks and associations faded, only for you. Click it again to put them away.
- Show it again: turn on N hidden, select the faded block or line, and choose Hidden on the diagram. Show it in the inspector, or Show on the diagram from the right-click menu. On a mind map you can also show or hide any state, risk or association from Relationships on the toolbar, even while it's hidden.
The states and risks bar
Once a board has at least one state or risk, a bar appears at the top of the canvas.
- States: All shows every element. Click a state to filter the diagram to it: only the elements in that state (and the state's block) are shown. Each state shows how many elements are in it. Click the state again, or All, to show everything.
- Risks: how many risks the board has.
- Colour by: Nothing, State or Risk rating.
- N hidden (only when something is hidden): shows hidden states, risks and associations faded, for you only. See Hide a state, risk or association.
The filter and the colouring are your own view. They don't change the board, and nobody else's view is affected, except for people following you: their filter and Colour by switch with yours while they follow. When they stop following, they keep what was showing and can change it.
Colour by state or risk rating
Colour by State
- An element in one state is filled with that state's colour.
- An element in several states shows each state's colour as stripes.
- Small colour chips above each element show its states; hover over them to see the names.
Colour by Risk rating
- Each element is filled with the colour of the band of its highest-rated associated risk: Low, Medium, High or Extreme.
- Small chips show each associated risk in its band's colour; hover over them to see the risk, its rating and band.
- A legend in the bar shows the four bands.
Elements with no associated state or risk keep their normal look.
On mind maps
Mind maps have states and risks too, and they work the same way: add them from the mind map's toolbar, associate concepts by dragging them onto a block, drawing an arrow to it or ticking them in the concept's details, then filter by state or colour the map by state or risk rating. Concepts show small chips for their states and risks. The mind map outline export lists each state and risk with its concepts.
In exports
- BPMN 2.0: BPMN has no states or risks, so each becomes a text annotation associated with its elements. States read "State: Current"; risks read "Risk: …" with the rating, band, likelihood, consequence and description.
- Business requirements document: the process description lists each state and the steps in it, and a risk register table lists each risk (highest rating first) with its rating, likelihood, consequence and the steps it affects.
See Exporting.
Asking the AI
The live AI can add states and risks, rate risks and associate elements with them. For example:
- "Add a future state and put the automated approval steps in it."
- "There's a risk that receipts get lost when they're posted. It's likely and the consequence is moderate. It affects the submit claim step."
- "Hide the late payment risk." or "Show the future state again." (hiding a state or risk hides its associations with it).
In Ask AI, the AI knows which states, risks and associations are hidden, so you can ask, for example, "which risks are hidden?".