BPMN basics
A short, practical primer on the BPMN elements Ceremon.ai uses, common patterns, rules of thumb and mistakes to avoid.
What BPMN is
BPMN (Business Process Model and Notation) is the international standard (ISO/IEC 19510) for drawing business processes. A BPMN diagram answers three questions at a glance:
- Who does the work: swimlanes.
- What they do, and in what order: tasks connected by flows.
- Where the process branches, waits or ends: gateways and events.
Business people can read it, and developers can build from it. Ceremon.ai exports standard BPMN 2.0 files that open in Camunda Modeler, bpmn.io, Signavio and similar tools. You only need a small subset of BPMN for most requirements work; these are the elements Ceremon.ai uses.
Events
Events are things that happen.
| Element | Use it for | Label it |
|---|---|---|
| Start event | What triggers the process. Every process needs at least one. | A trigger or state: "Order received", "Month end". |
| End event | An outcome. Use a separate end event for each distinct outcome (success, cancelled, rejected). | The result: "Claim paid", "Application rejected". |
| Timer event | A wait, deadline or schedule. The process pauses until the time is reached. | "3 days pass", "Every Monday 9am". |
| Message event | Waiting for, or reacting to, a message from outside: an email, a webhook, a letter. | "Payment received", "Supplier replies". |
Activities
Activities are work being done.
| Element | Use it for | Label it |
|---|---|---|
| User task | A person does it in a system (a screen in the app you are designing). Most requirements hang off these. | Verb + object: "Approve claim". |
| Service task | The system does it automatically, with no person involved: calculations, API calls, notifications. | "Calculate tax", "Create invoice". |
| Manual task | Physical or offline work the system doesn't touch. | "Pack parcel", "Inspect site". |
| Business rule task | A decision made by applying rules or a decision table. Capture the rules as requirements. | "Check eligibility", "Assess risk". |
| Send / receive task | Sending or receiving a message as part of the work. | "Email customer", "Receive signed form". |
| Sub-process | A chunk of the process with its own detail. Use it to keep the main diagram readable. In Ceremon.ai it can have its own board. | "Onboard supplier". |
Gateways
Gateways are where the flow splits or joins.
| Element | Use it for | Label it |
|---|---|---|
| Exclusive gateway (XOR) | Exactly one path is taken. Label each outgoing flow with its condition. | A question: "Approved?", "Over $500?". |
| Parallel gateway (AND) | All paths run at the same time. Join them again with another parallel gateway. | Usually unlabelled. |
| Inclusive gateway (OR) | One or more paths, depending on conditions. | A question. |
| Event-based gateway | Wait for whichever event happens first (a reply or a timeout). | Usually unlabelled. |
Data and notes
| Element | Use it for | Label it |
|---|---|---|
| Data object | Information a step needs or produces: forms, documents, records. These suggest data requirements. | A noun: "Invoice". |
| Data store | Where information is kept long term: a database or a system of record. | "CRM", "Customer database". |
| Annotation | A note for readers. Explain a rule or an assumption without cluttering labels. | Free text. |
Connections
- A solid line with an arrow is a sequence flow: the order of work.
- A dotted line with no arrow is an association: it links data objects and annotations to the steps that use them. Ceremon.ai also uses dotted "associated" lines for states and risks.
- Label the flows leaving an exclusive gateway with their condition.
Common patterns
- Decision: ask the question in an exclusive gateway and put the answers on the outgoing flows. For example, "Review application", then "Approved?", with "Yes" to "Issue licence" and "No" to "Send rejection letter". In conversation, listen for "if…", "otherwise", "depending on".
- Parallel work: split with a parallel gateway when several things happen at the same time, and join with another parallel gateway when all of them must finish before moving on. For example, IT creates accounts while facilities sets up a desk, then the new starter is welcomed. Listen for "at the same time", "meanwhile", "both".
- Rework loop: when work can be sent back, loop the flow back to an earlier step through a gateway, for example "Legal review", "Changes needed?", "Revise contract" and back to review. Ceremon.ai draws return flows over the top or bottom so the main path still reads left to right. Listen for "send it back", "resubmit", "until it is right".
- Wait for a reply or a deadline: an event-based gateway waits for whichever happens first, for example a message event "Customer accepts" or a timer event "14 days pass". Listen for "wait for", "if we haven't heard back", "within 14 days".
- Hand-offs: each time the flow crosses a lane boundary, work changes hands. Hand-offs are where delays, notifications and permissions live, so they are rich sources of requirements.
Rules of thumb
- Start with the happy path: the normal case from trigger to outcome. Add exceptions afterwards.
- One step is one piece of work by one role. If a step needs two lanes, split it.
- Name tasks verb + object ("Approve claim"), events as states ("Claim approved"), and gateways as questions ("Approved?").
- Lanes are roles or systems, not people. Use "Line manager", not "Sarah", so the process stays valid when staff change.
- Vertical lanes on their own give a vertical swimlane diagram that reads top to bottom. Added to horizontal lanes they become columns, such as phases ("Submit", "Approve", "Pay"), and each step sits in one role and one phase.
- Every path ends. Each branch reaches an end event, and different outcomes get different end events.
- Use the right task type. User task versus service task tells developers what needs a screen and what needs automation.
- Keep it readable. If a diagram goes past about 15 to 20 steps, move a section into a sub-process.
- Model what happens, not what should happen, unless you are designing the future state. In Ceremon.ai you can use states to show current and future versions on one board.
Common mistakes
- Unlabelled decision branches: readers can't tell which path is which. Always label the flows leaving an exclusive gateway.
- Using a gateway to merge different decisions: join branches only when they really come back together. Otherwise give them their own end events.
- Parallel split, exclusive join: if you split in parallel, join in parallel. Otherwise the process continues after the first branch finishes.
- Tasks named after systems or people: "CRM" or "Bob" isn't work. Put the system or role in the lane and name the task by what is done.
- Dead ends: a task with no outgoing flow (and no end event) means the process silently stops.
- Too much detail: clicks and fields belong in requirements and acceptance criteria, not in the process diagram.
Writing good requirements
The process diagram shows what happens. Requirements say what the system must do to support it. Ceremon.ai links every requirement to the steps it supports, so the export includes a traceability matrix.
A good requirement is one testable statement that says what, not how, and is linked to the steps it supports. For example: "The system shall route each submitted claim to the employee's line manager for approval."
Write acceptance criteria in Given / When / Then form, one per rule or edge case. They become test cases. For example: "Given an approved claim over $500, when it reaches finance, then it is routed to the finance director before payment."
- Categories: functional, business rule, data, integration, reporting and non-functional (performance, security, availability).
- Priority uses MoSCoW: Must, Should, Could, Won't (this time).
- Mark a requirement confirmed when stakeholders agree, and rejected when it is dropped. Rejected items are kept in the export as "out of scope".
Where to look for requirements: every user task (screens, permissions), service task (automation, integrations), business rule task (rules, thresholds), hand-off between lanes (notifications, queues, SLAs), data object (fields, retention) and timer event (reminders, escalations).
The full guide
The interactive BPMN guide is part of this documentation: it has every example drawn as a live diagram, tips for running a session, and a short quiz to check your understanding. It runs in the app, so it needs you to sign in. Open it from BPMN guide (interactive) in the list of pages here, the account menu (BPMN guide), or the ? icon in a board's top bar.