# Kanban boards

> Task boards with swimlanes and columns, with task cards and requirement cards, that the AI fills from the conversation.

## What a kanban board is

A kanban board is a task board laid out as a grid: **swimlanes** run across (rows, for example work streams such as client work, operations or business development) and **columns** run down (for example the status of the work: Not started, In progress, Blocked, Done). Every card sits in exactly one cell, so you can see the shape and balance of all your work at a glance.

A card is either a **task** (a piece of work) or a **requirement card** (a business requirement, with the same fields as a requirement on a process diagram). See [Requirement cards](#requirement-cards).

Kanban boards work like process boards in every other way: the same live conversation and transcript, the same AI listening in, the same **Ask AI** chat, sharing, projects, Activity and undo. They don't have a Requirements tab: requirements live on the board as requirement cards, and you can [send requirements to a kanban board](#sending-requirements-to-a-kanban-board) from a process board or mind map, or [keep them in sync](#keeping-requirements-in-sync).

## Creating a kanban board

On the home page or a project page, create a new board and choose **Kanban board** instead of **Process diagram**. The board starts with three fields:

- **Status**: Not started, In progress, Blocked, Done (the columns).
- **Priority**: Urgent, Important, Medium, Low.
- **Workstream**: General (the swimlanes). Add your own workstreams as you go.

and one view, **By workstream**, with workstreams as rows and statuses as columns.

## Working with cards

- **Add a card**: choose **+ Add card** at the bottom of any cell, type a title and press Enter. The card lands in that cell, and you can keep typing the next one.
- **Find a card**: type in **Filter cards** above the board to show only matching cards.
- **Move a card**: drag it to another cell, including diagonally (a new workstream and a new status in one move), or up and down within a cell to reorder it. Everyone sees the move straight away.
- **Open a card**: click it to open the card panel at the side. It edits the title, notes, every field (status, priority, workstream and your own fields), who it's allocated to, start and due dates and a checklist. The board stays usable while the panel is open. Changes save as you type.
- **Assign a card**: in the card panel, **Assigned to (accountable)** takes one person: the one accountable for the card. Pick them like when sharing: the list shows the board's members and the people already on its cards, and typing finds people in your organisation. Type an email address to use someone who isn't on the board yet: if you can share the board, you're offered **Share the board with … and use them**, which shares it with them as an editor (they get access when they sign in with that address). You can also type any name. Remove the assignee with the cross on their chip.
- **Supporting people**: **Supporting** takes any number of people who help the assignee (up to 20), picked the same way. Making a supporting person the assignee moves them across, so a card always has one accountable person.
- **Full screen**: the expand button at the top of the card panel (next to History and Share) opens the same card full screen, with a large notes box for long notes. Everything still saves live and others' changes still appear. Press Escape (or the shrink button) to go back to the side panel; Escape again closes the card.
- **Screenshots and images**: copy a screen capture (for example with Windows+Shift+S, or Cmd+Ctrl+Shift+4 on a Mac), click in the card's **Notes** and paste it. It's added to the card and shown as a thumbnail under the notes; click it to see it full size. You can also drag image files onto the notes, or use **Add image** (on a phone this can take a photo). PNG, JPEG, WebP and GIF work; big screenshots are shrunk to at most 2400 pixels across before they're uploaded, and each must end up under 5 MB. A card holds up to 20 images and a board up to 100 (removed images stop counting after a day). Hover over a thumbnail and click its **×** to remove it from the card. A removed image stops showing for everyone straight away and is deleted for good within about a day, so undo straight away if you removed it by mistake. Only people who can see the board can see its images, and they're deleted with the board. Cards show how many images they have.
- **Reorder the checklist**: drag an item up or down by its handle (the dots on the left). With the keyboard: focus the handle, press Space, move it with the arrow keys, and press Space again. Viewers can't reorder.
- **Delete a card** from its panel.
- Cards show their priority, due date, the assignee's initials (and supporting people's, in dashed circles) and checklist progress. Requirement cards also show their reference (REQ-001) and MoSCoW priority. Cards that came from a requirement on a process board show where they came from (for example **From REQ-003**); click it to open that requirement on its process board.
- **Constraints and limitations**: a process diagram or mind map can send its constraints and limitations here as cards with a **Constraint type** and **Constraint status**, and keep them in sync. See [Constraints and limitations](constraints-and-limitations#send-them-to-a-kanban-board).
- **Applications**: relate a card to the software applications and IT systems its work uses or changes (for example SAP). Tick them in the card panel, or add a new one there; manage the board's list with **View options**, **Applications…**. Cards show a chip for each application, and **View options** can filter the board to one application or colour the cards by application. See [Applications](applications).
- **Related** at the bottom of the card panel links the card to another card on this board, or to a step or requirement on a process diagram or a concept on a mind map, and lists what links to it. Click a link to open it. Cards with links show a small link count. See [Links between boards](linking-boards).
- A swimlane or column can be collapsed to a thin strip that still shows how many cards it holds. Click it again to expand it.
- Cards with no value for a row or column field sit in a **No Workstream** (or **No Status**, and so on) lane, so nothing is ever hidden.

Undo and redo work for your own changes, and every change is recorded in **Activity**, as on process boards. To see one card's history (who changed it, when, and from what to what, for example a status change from To do to Doing), click the **History** button (the clock icon) at the top of the card panel. See [History of one element](editing-the-diagram#history-of-one-element).

## Requirement cards

A requirement card holds a business requirement, with exactly the fields a requirement on a process diagram has:

- a **reference** (REQ-001, REQ-002 and so on, numbered on this board and given automatically),
- the **title** (one sentence, for example "The system shall email the applicant when their form is approved"),
- **Description** (context, rationale, detail),
- **Category**: functional, non-functional, business rule, data, integration or reporting,
- **MoSCoW** priority: must, should, could or won't have,
- **Status**: proposed, confirmed or rejected (rejected cards are struck through),
- **Acceptance criteria** (Given/When/Then, as many as you need),
- **Source quote**: what was said.

It is still a card: it sits in a swimlane and column, has status, priority, workstream, assignee, dates, notes and a checklist, and moves like any card.

- **Change a card's type**: open the card and choose **Task** or **Requirement** under **Type**. A task's notes become the requirement's description the first time. Switching back to a task keeps the requirement's fields (hidden), so switching again loses nothing, and the card keeps its reference.
- A requirement card doesn't have to be related to a process, but it can be: link it to the process steps it affects under **Related**, and click the link to open the process with that step selected.
- The AI adds requirement cards when people state requirements rather than tasks ("the system must…", "users need to be able to…"), with acceptance criteria when people describe how it will be tested.

## Views and fields

- A **view** picks which field forms the rows and which forms the columns. Switch views with the tabs above the board, or create one (for example **By priority**: priorities as rows, statuses as columns). Any two different list fields can be used. Which view you're looking at, and which lanes you've collapsed, is your own choice and doesn't change what others see.
- **A lane per person**: choose **Allocated to** for the rows (or the columns) of a view, for example a view **By person** with statuses as rows and people as columns, to see who has what. Everyone a card is allocated to gets a lane: its assignee and its supporting people (names match regardless of capitals), and cards with nobody assigned go in **Unassigned**. In a person's lane, each card says whether they're **Assigned** (accountable) or **Supporting**. A card shows in its assignee's lane and, with a dashed border, in each supporting person's lane; it's the same card, so open it from either. Drag a card (from its assignee's lane) into someone's lane to make them the assignee, or into Unassigned to clear it; a card added in a person's lane is assigned to them. A new person gets a lane once a card is allocated to them.
- **Lanes by linked card**: when this board's cards are [linked](linking-boards) to cards (or steps) on another board, a view can use **Linked to <that board>** for its rows or columns, for example a **General** board laid out by the cards on a **Strategic pursuits** board. Each linked card on the other board gets a lane holding the cards here that link to it, and cards with no link to that board go in **Not linked**. A card linked to several of them shows in each of their lanes (dashed, after the first). Drag a card into another lane to link it to that card instead, or into **Not linked** to remove its link; a card added in a lane is linked to that lane's card. Links made from the other board show here too, but can only be changed on that board. Lanes appear for linked cards only: link a card to one first (in the card panel's **Related**).
- **Fields** (**View options**, **Fields…**): add your own fields to cards: list fields (with options you choose, which can also become rows or columns), text, date or number fields. You can rename, recolour, reorder and remove the options of any list field, including Status, Priority and Workstream. The three built-in fields can't be deleted.

## On your phone

Open a Kanban board on a phone and it switches to a layout made for a small screen:

- **One column at a time.** The columns of the current view (for example Not started, In progress, Done) are buttons across the top, each with how many cards it holds. Tap one to see its cards as a list, grouped by row lane (for example by workstream).
- **Add task.** Tap the purple **Add task** button at the bottom, type what needs doing, and tap **Add** (or press Enter). The sheet stays open so you can add several in a row; pick the column (and lane, when the board has more than one) for each. **Add and open** adds the card and opens its details so you can add notes.
- **Open a card** by tapping it. Its details fill the screen. To move it, change its Status (or the other fields) there; dragging cards is for bigger screens.
- **The side panel** (Conversation, Ask AI, Activity…) is hidden on a phone. Tap the speech-bubbles button at the right of the top bar to open it over the board, and tap it again to go back.
- **Your account menu** (your picture at the top right) is there on a phone too: your name and picture, My usage, My data, MCP access, the tour, Documentation, Report a bug or idea and Sign out.
- **View options → Filters…** works on a phone too: for example, the cards changed in the last day, or only Status In progress.
- Some controls are only on bigger screens: exporting, undo and redo buttons, the model picker and following people. Changes still save and sync live, and the AI works as usual.

The phone layout is used when the screen is narrower than 640 pixels; turn a tablet or widen the window to get the full grid.

## View options: filters, colours, applications and fields

The **View options** button, to the right of the **Filter cards** box at the top right of the board, has four items. Each opens its own window:

- **Filters…**: show only some cards. **Changed**: cards **updated** or **created** in the **Last day**, **Last week**, **Last month** or a **Custom…** date range (from the board's Activity history, so it covers earlier changes too). Then one row per list field (**Status**, **Priority**, **Workstream** and any list field you've added): click options to show only cards with them (several options in one field means any of them). **Application** shows only the cards related to one application. The count at the bottom (for example **3 of 40 cards**) updates as you go; **Clear all** removes every filter.
- **Colour cards…**: see below.
- **Applications…** and **Fields…**: manage the board's applications and fields.

While any filter is on, a line under the toolbar says what's showing (for example "Showing cards updated in the last week · Status: In progress"), with **Edit** and **Clear**. A number on the **View options** button shows how many filters and colours are on. Filters and colours are only your view, remembered in your browser (the Changed filter resets when you open another board). The **Filter cards** box still filters by text as you type.

## Colour the cards

Open **View options** and choose **Colour cards…**, then pick **Colour cards by**: **Status**, **Priority**, **Workstream**, any list field you've added, or **Application** (when the board has applications). Each card gets a light tint and a coloured stripe down its left edge in the colour of its value, and a line under the toolbar shows what each colour means. A card with no value for that field stays white. Choose **Nothing**, or **Clear** on that line, to stop.

The colours are the field's option colours: change them under **View options**, **Fields…**. Colouring is your own view, like the view you're on, but people following you see the same colours.

The colour window shows what each colour means before you close it.

## Seeing each other

Everyone on the board, viewers and guests included, sees where the others are pointing: a cursor in each person's colour with their name. A cursor sits on the same card or cell for everyone, whatever their window size or how far they have scrolled. You only see the cursors of people looking at the same view as you (switch to their view to see theirs), and the cards each person has selected or open are outlined in their colour.

## Following someone

Click someone's avatar in the top bar to follow them: your board scrolls with theirs, so you see the same lanes and cards, even on a different screen size. A banner shows whose view you're following. Click it, press **Esc**, or scroll yourself to stop. See [Following someone](editing-the-diagram#following-someone).

## The AI on a kanban board

Switch **Talk** on and talk through the work as you would in a planning or stand-up meeting. The AI listens and keeps the board up to date:

- It adds cards for new pieces of work, with notes, a priority, an assignee and a due date when people mention them, and requirement cards for requirements.
- It moves cards between swimlanes and columns when people say work has started, is blocked or is done.
- It adds workstreams when a new stream of work comes up, and checklist items for the steps of a task.
- It links related cards on the board when asked ("link the training data card to the learning framework card"), so both list each other under **Related**.
- It relates cards to applications when people name the systems involved ("loading the vendors is done in SAP"), adding the application to the board's list if it's new.
- You can ask it directly, for example "Ceremon, add a card to the client work lane to send the quote to Acme by Friday", "move the website refresh to done", "make the payroll card urgent" or "turn that card into a requirement and mark it must have".
- "Row" and "column" mean the view **you** have open. Everyone picks their own view, so if you're looking at a view with Priority as the columns, "move it to the Urgent column" sets its priority. (Ask AI's **Make this change** uses the view of the person who clicked it. MCP agents use the board's first view.)
- It can put a card in a particular place: "move the contract card above the invoice card" or "put this at the bottom of the column, under the logo task".
- It can reword, reorder or remove checklist items: "move 'book the venue' to the top of the checklist", "remove the last checklist item".
- When asked, it can change the board's structure as **View options** does: add a field ("add a list field called Team with Sales, Support and Ops"), rename or delete a field (not the built-in Status, Priority and Workstream, and not a field a view uses), change an option's colour or order or remove it ("make the Blocked column red", "put Urgent last"), add, rename, change or delete a view ("add a view with a row per person and Status as the columns"; the last view can't be deleted), and change an application's colour.

You see the AI's cursor and a highlight on the card it's working on. **Undo AI** reverts its last turn. Uploading a document (meeting notes, a project plan) works too: the AI turns it into cards.

The **Ask AI** chat answers questions about the board and the conversation, for example "what's blocked?", "what does Sam have on this week?", "which workstream has the most work in progress?" or "which requirement cards have no acceptance criteria?". Like on process boards, it can also propose a change ("move the supplier card to Done") that you confirm with **Make this change**; see [Ask AI](ask-ai#ask-it-to-change-the-board).

## Sending requirements to a kanban board

On a process board or mind map, open **Requirements**, select one or more requirements and choose **Send to Kanban**. Pick an existing kanban board, or create a new one.

- Each requirement becomes a **requirement card** titled with its reference and title (for example "REQ-003: Show claim status to employees"), with the requirement's description, category, MoSCoW priority, status, acceptance criteria and source quote. Its Priority field comes from the MoSCoW priority (must → Urgent, should → Important, could → Medium, won't → Low), and it starts in the first status column. The card gets its own reference on the kanban board; **From REQ-003** shows where it came from.
- Each card is linked to the process steps (or mind map concepts) its requirement supports, so you can open them from the card.
- The requirements stay on the process board. Sending them doesn't move or delete anything.
- Sending the same requirement again updates its card instead of adding a duplicate.

## Keeping requirements in sync

A process board or mind map can keep all its requirements in sync with one kanban board: in its **Requirements** tab choose **Sync to Kanban** and pick the board. Every requirement added or changed there then becomes or updates its card here a couple of seconds later, shown in Activity as **Requirement sync**. Cards don't sync back, and deleting or rejecting a requirement leaves its card alone. Syncing runs as the person who switched it on and stops by itself if they can no longer edit this board. See [Requirements and Azure DevOps](requirements-and-azure-devops#keeping-requirements-in-sync-with-a-kanban-board).

## Exporting

From **Export** on a kanban board you can download the cards as a spreadsheet (CSV, one row per card with every field, and its applications), the transcript, or the board data (JSON).

See also [Boards and projects](boards-and-projects), [Links between boards](linking-boards), [Mind maps](mind-maps), [Live sessions](live-sessions), [Ask AI](ask-ai) and [Requirements and Azure DevOps](requirements-and-azure-devops).
