# Constraints and limitations

> Record what the solution must do (constraints) and what it can't do (limitations), with a status, link them to steps, concepts and requirements, and send them to a Kanban board.

## What they are

A **constraint** is something the solution must do or comply with: a rule, a policy, a regulation or a standard. For example "Must use the corporate single sign-on" or "Must meet PCI DSS".

A **limitation** is something the solution can't do: a known gap or restriction. For example "Can't store card numbers" or "No offline payments".

Both are blocks on the board, like [states, risks](states-and-risks) and [applications](applications). Each has:

- a **type**: Constraint or Limitation;
- a **status**: **Draft** (the default), **Validated**, **Approved** or **Retired**;
- a statement (its name) and an optional description, for example where it comes from.

You can associate any number of steps (on process diagrams) or concepts (on mind maps) with a constraint, and any step or concept can have any number of constraints. Requirements can list the constraints and limitations that apply to them too.

Kanban boards don't have constraint blocks; send them to a Kanban board instead (see below).

## Add one

- Click the **gavel** icon in the toolbar (**Constraint or limitation**), or right-click the empty canvas and choose **Add a constraint or limitation here**. Type its statement straight away. It starts as a draft constraint.
- Or open the **Constraints** tab in the side panel and click **+ Constraint** or **+ Limitation**.
- On a mind map, use the gavel on the mind map's toolbar or right-click the empty map.
- Select it to change its **Type** and **Status** and give it a description in the inspector. You can also change the type and status on the Constraints tab.

The block shows its type (a gavel for a constraint, a no-entry sign for a limitation) and its status. A retired one is faded. Constraints sit in the row above the diagram with the states, risks and applications, so they don't change the automatic layout.

## Associate steps and concepts

The same ways as states, risks and applications:

1. **Drag** the step or concept onto the constraint block. It's associated and snaps back.
2. **Draw a line** between the element and the block.
3. **Tick it in the inspector**: select the element and tick the constraint under **Constraints and limitations**.
4. **Right-click**: choose **Constraints and limitations** and tick one. With several elements selected, this associates (or removes) all of them at once.
5. **All of them**: select the block and choose **Add all N elements**.

An association is a dotted indigo line labelled "associated". On a mind map, concepts show a small chip for each constraint with its status. To remove one, untick it or delete the dotted line.

## Link requirements

- **From the constraint**: select the block. Under **Applies to requirements**, tick each requirement it applies to.
- **From the requirement**: open the requirement on the **Requirements** tab. Under **Constraints and limitations**, pick one from **+ constraint…**; click the **×** on a chip to take it off.

Deleting a constraint takes it off its requirements and removes its associations. Undo brings them back.

## The Constraints tab

On process diagrams and mind maps the side panel has a **Constraints** tab listing every constraint and limitation with its status and how many elements and requirements it applies to.

- **Show** All, Constraints or Limitations, and filter by status.
- Click a name to select it on the board.
- Change its type or status from the list.
- The bar at the top of the canvas shows how many constraints and limitations the board has.

## Send them to a Kanban board

This works like [sending requirements](requirements-and-azure-devops), so you can track constraints and limitations through Draft, Validated, Approved and Retired on a Kanban board.

1. On the **Constraints** tab, click **Kanban**. Selected constraints are ticked; otherwise every one that isn't retired.
2. Pick a Kanban board you can edit, or **New kanban board…** with a name.
3. Click **Send**.

Each constraint or limitation becomes a card:

- the card's title is the statement, and its notes are the description and the requirements it applies to;
- two list fields are added to the Kanban board: **Constraint type** (Constraint, Limitation) and **Constraint status** (Draft, Validated, Approved, Retired);
- a view **By constraint status** is added, with a row per type and a column per status. On a new (empty) board it's the first view;
- the card links back to the constraint and to the steps or concepts it applies to (see [Links between boards](linking-boards)).

Sending one again updates its card (title, notes, type and status) instead of adding another. The card's own progress on the Kanban board (its Status, lane, owner and checklist) is left alone. A retired constraint updates a card it already has but doesn't get a new one.

### Keep them in sync

Under the Constraints tab's toolbar, click **Sync to Kanban** and pick a board. Every constraint or limitation added or changed on this board (by people, the AI or an MCP agent) then becomes or updates its card there, a couple of seconds later. **Change** picks another board; **Stop** switches it off. It's separate from requirement sync, so the two can go to different boards.

- It runs as the person who switched it on. If they can no longer edit the Kanban board or view this one, sync switches itself off and everyone on the board is told why.
- Deleted constraints leave their cards as they are. Cards don't sync back: moving a card between status columns on the Kanban board doesn't change the constraint.

## In exports

- **BPMN 2.0**: each becomes a text annotation ("Constraint: …" or "Limitation: …" with its status and description) associated with its steps.
- **Business requirements document**: a **Constraints and limitations** table lists each one with its type, status and what it applies to (steps and requirement references), and each requirement lists its constraints.
- **Mind map outline**: constraints and limitations are listed with the states, risks and applications, each with its status and concepts.

See [Exporting](exporting).

## Asking the AI

The live AI adds constraints and limitations when people state them, associates the steps or concepts they apply to, lists them on requirements, and updates their status. For example:

- "We must use the corporate single sign-on for every login step."
- "The till can't take payments offline. That's a limitation."
- "The PCI constraint is approved now." or "Retire the paper forms constraint."
- "Make a Kanban board for the constraints and keep it in sync."

It reuses one already on the board instead of adding a duplicate. In **Ask AI** you can ask, for example, "Which constraints are still in draft?" or "Which requirements does the SSO constraint apply to?".

MCP agents have the same actions: `add_node` with type `constraint` (or `add_constraint` on a mind map), `constraint_kind` and `constraint_status`, `constraint_ids` on `upsert_requirement`, and `send_constraints_to_kanban`. See [Connect an AI agent (MCP)](mcp).

## Limits

- A requirement can list up to 50 constraints and limitations.
- Up to 200 constraints are sent to a Kanban board at a time.
